Using a lumber buttress system to support the house after lifting, No Problem Builders moved around the exterior of the house replacing the sill plates and rim boards. The old concrete blocks were then broken away and removed and new brick piers were built. In this image, roofing paper can be seen that covers the exposed sections of the under-siding which needed to be removed for the operation. The long planks seen stored under the house here are old bleacher seat tops we found under the house.